CHANNEL 11 TV STUDIO/COMPUTER FACILITY - CITY OF PHOENIX
Mechanical and electrical engineering services for design and construction of a 43,000 SF facility consisting of 5,700 SF Studio A and a small studio B of 840 SF. Each were designed within NC levels of 25 or less. System consisted of two 300 ton variables speed
R-123 centrifugal chiller and two towers. One chiller is for redundancy, as well as the second cooling tower. One half of the building is the computerized check writing facility for the City of Phoenix with chilled water computer room units for temperature and humidity control. The project was bid within budget in May of 2000
and construction was completed September of 2001. The uniqueness of this project is that it is to be built within an
existing seven story parking garage facility in downtown Phoenix.
KJZZ/KBAQ
Mechanical and electrical engineering services for two public radio stations operated by the Maricopa Junior College District. Facility is 19,000 SF and the mechanical and emergency electrical systems are designed to operate independently from the existing six story building mechanical system in which the facility is being placed. The activity in the radio stations are broadcast for homebound people and a special area by Sun Sound is provided to record tapes for newspapers, magazine articles and books for the blind. The mechanical and electrical systems are separate air conditioning systems with emergency power back-up for continuous broadcasting upon local power interruption. Project
was bid in September 2000 with construction completed mid 2001. Project budget is $1.4M. Construction
was completed in March 2001.
KNXV ABC AFFILIATE STUDIO (CHANNEL 15)
Mechanical and electrical engineering services from programming through construction documents for public bidding an 80,000 SF, TV offices, two story production and two news studios each with sound level criteria NC20. Project includes office space, 3 level parking garage, two major production studios, two high-tech communications areas, UPS, emergency generation, two 250 ton centrifugal chillers, primary-secondary pumping, VAV and constant volume AHUs and DDC
energy management system, $12.5M, 1995-96. Construction completed in 1998.
APS DATA CENTER
High-speed print facility and microfilm area, 6,000 S.F., HVAC and electrical with special filtration for return air in print area, 1997.
ARIZONA DAILY SUN
Newspaper Office and printing facility, ±10,000 S.F. printing area with presses, billing office and administrative area. Total 30,400 S.F., Flagstaff, AZ, 1997.
PRINCESS ACCOUNTING/DATA PROCESSING OFFICE
Billing and printing area for main accounting office at Scottsdale Princess Hotel (690 room resort), 1,800 S.F. re-air in print area, Scottsdale, AZ, 1997.
ST. PAUL BUILDING FOR BGA, MSA, & PAYCHECK
Mechanical, plumbing and electrical design for St. Paul Digital Insurance building for future building
offices 151,000 S.F., 1996.
AUTO OWNER'S INSURANCE BUILDING
Mechanical, plumbing and electrical design for Auto Owner's Insurance Building, 22,000 S.F. insurance facility, Mesa, AZ, 1995.
SCOTTSDALE MEMORIAL HOSPITAL MANAGEMENT INFORMATION SYSTEMS TI
Management Information Systems T.I. at Scottsdale Memorial Hospital for all billings, financial transactions, computer room, etc.; 24-hour operation, UPS; Scottsdale, AZ.
GLENDALE COMMUNITY COLLEGE - HIGH TECH CENTER II
Mechanical design of Computer Center in High Tech Building II, Glendale, AZ, 1989.
FIREMAN'S FUND COMPUTER DATA CENTER
Mechanical design for Computer Data Center at Fireman's Fund, Phoenix, AZ, 1989.
GLENDALE COMMUNITY COLLEGE - HIGH TECH CENTER I
Mechanical design of Computer Center in Hi-Tech Building, Glendale, AZ, 1986.
BLUE CROSS/BLUE SHIELD
Mechanical design of Computer Center for Blue Cross/Blue Shield, Phoenix, AZ, 1986.
WESTERN AREA COMPUTER CENTER
Mechanical design for Computer Center at Motorola Inc., GEG, Scottsdale, AZ, 1985.
QUALITY INN COMPUTER RESERVATION CENTER
Mechanical design for Computer Center and support area, Phoenix, AZ, 1985.
IBM COMPUTER CENTER
Mechanical design of Computer Center and support area, Phoenix, AZ, 1984.
AXXESS ENTRY TECHNOLOGIES, INC.
Facility for key manufacturing plant in existing 167,000 SF and 45,000 SF main office area. MPE consisting of two, 200 ton chillers, a 3,000A 460V system for the manufacturing building. For the office building, HVAC entailed 350 tons of packaged equipment and a 1,200A, 460V electrical distribution system of lights and power. Total budget $4.5M, 1997-98.
A-RAND ELECTRICAL MANUFACTURING
MPE for 11,000 SF electrical equipment manufacturing plant, $132K, 1997-98.
MICRO-REL T.I. OFFICES
Micro-Rel, 3rd Floor T.I. offices, 9,000 SF, $360K, Tempe, Arizona, 1997.
MICRO-REL
Micro-Rel SK1000 Hood stainless steel acid/solvent exhaust system with condenser liquidation heat exchanger, ductwork/fan controls, 1997.
APS DATA PROCESSING CENTER
Mechanical and electrical engineering design services for the remodel of a 5,100 SF new developer and high speed printer area at 2121 E. Sheryl, Phoenix, Arizona, 1997.
MEDTRONICS (MICRO-REL)
Expansion of Class 100K cleanroom 3200 S.F. Design included HVAC process pipe, electrical power and lighting, fire alarm, solvent and general exhaust, $350K, 1997.
CARBORUNDUM
New Class 100 clean room for research in this film technology. SDI was prime design firm responsible for HMC, process piping, light and power, and exhaust systems, $350K, 1994-95.
CSI CLEANROOM
Mechanical and electrical systems design for new 2,000 SF Class 100 Clean Room, mechanical and electrical systems, Phoenix, Arizona, 1995.
MOTOROLA ROOSEVELT CAMPUS
Facility for the "J-Star" program in the existing Building 22. Design included new 480 volt, 400 amp distribution to serve the HVAC system and electronic test equipment, $450K, 1993-94.
MOTOROLA CHANDLER-OCOTILLO CAMPUS
12,000 SF facility for the new Iridium project which consisted of extending 480 volt, 800 amp power to serve lighting, HVAC, test benches, and thermal chambers, $500K, 1994-95.
MOTOROLA BACK METAL CLEAN ROOM
Mechanical and electrical engineering design services for modifications for Phase I and Phase II of back metal polishing and deposition Class 100 Clean Room utilizing existing AHUs and new HEPA systems, at 52nd Street, Building P, 7,500 SF, 1994-95.
PALO VERDE NUCLEAR GENERATING STATION - NEW MOD BUILDING
Mechanical and electrical engineering design for the new MOD building for Palo Verde Nuclear Generating Station, 1993.
MEDTRONIC - MICRO-REL, BRADY AND TACHY BUILDING
Mechanical and electrical engineering design services for the remodel of the Brady Manufacturing Area (38,000 SF) in Buildings #1 and #2, and the remodel of the Tachy Manufacturing Area (10,500 SF Office, 3,260 SF Class 10,000 Clean Room space) in Building #4, Tempe, Arizona, 1992.
GLOBAL-WULFSBERG EXPANSION
Mechanical and electrical engineering design services for the 30,000 SF expansion of the Global-Wulfsberg Facility, Prescott, Arizona, 1992.
MOTOROLA, INC., HAYDEN CAMPUS - WACC EXPANSION
Mechanical and electrical engineering design services for the replacement of Chillers #1, #2, #3, and #4, with three (3) new 600 ton chillers. This project included central plant piping system provisions for the future addition of a plate and frame heat exchanger and a chilled water thermal storage system, Scottsdale, Arizona, 1992.
ARIZONA PUBLIC SERVICE - CHEMICAL STORAGE BUILDING
Mechanical and electrical engineering design services for 15,000 SF Chemical Storage Building at the Palo Verde Nuclear Generating Station, Phoenix, Arizona, 1992.
DIGITAL EQUIPMENT CORP.
Mechanical and electrical engineering design services for the 32,000 SF remodel at Digital Equipment Corp., TFO-2 Facility, Tempe, Arizona, 1992.
PALO VERDE NUCLEAR GENERATING STATION - NEW TRAINING CENTER
Mechanical and electrical engineering design services for the remodel of the 45,000 SF Administration Annex, 30,000 SF Administrative Annex Addition, and the 4,200 SF Carpenter Shop, Phoenix, Arizona, 1992.
HONEYWELL BEARING LAB
Mechanical and electrical engineering design services for the retrofit of a 300 SF Class 100 Clean Room Lab, 68 degrees F and 45% RH, Phoenix, Arizona, 1991.
CYPRUS MIAMI MINE - ANALYTICAL LAB
Mechanical engineering services for the rehabilitation of the Analytical Lab at Cyprus Miami Mine, including 8,400 SF Analytical Laboratory Building and the addition of a 765 SF Fire Assay Laboratory, Miami, Arizona, 1991.
DIGITAL EQUIPMENT CORP. - CLEAN ROOM
Mechanical and electrical engineering design services for the 2,500 SF Sputtering Clean Room (with 1,650 SF of raised floor), a 3,700 SF Test Clean Room, modifications to the existing HVAC system to reduce the amount of pressurization in the Clean Room, Tempe, Arizona, 1991.
DIGITAL EQUIPMENT CORP. - BEAD BLAST
Mechanical and electrical engineering design services for the fit-up of three new rooms in the existing Digital TFO-2 Basement (945 SF) to accommodate two beadblasters, a Dust Collection Room and an Aqueous Cleaner Room, Tempe, Arizona, 1991.
DIGITAL EQUIPMENT CORP. - LAB/OFFICE/SHOP REMODEL
Mechanical and electrical engineering design services for the remodel of the 8,400 SF office area (60 offices), 11,200 SF general laboratory, and 1,200 SF machine shop, Tempe, Arizona, 1991.
MOTOROLA, INC., 52ND STREET PLANT
Mechanical and electrical engineering design services for the demolition and remodel of the Motorola Polish Cell, Phoenix, Arizona, 1991.
MOTOROLA ALUMINUM METAL OXIDE DEPOSITION
Mechanical and electrical engineering services for the revision of an existing area to house several new sputter units (aluminum metal oxide deposition). Design also consisted of necessary process piping for the 450 SF area, 52nd Street Plant, Phoenix, Arizona, 1990.
MOTOROLA AUTOMOTIVE RECTIFIER PRESSURE FIT
Mechanical and electrical design consisting of revising an existing area to house a production pilot line for an automotive rectifier pressure fit operation. This included acid, solvent, and general exhaust, and process piping designs for the new equipment. Area of the renovation was 4,000 SF, 52nd Street Plant, Phoenix, Arizona, 1990.
MOTOROLA BACK METAL
Mechanical and electrical system design for a new AHU system for Clean Room with new HEPA filters to maintain a Class 100 Clean Room. Design also included process piping and a layout, electrical lighting and power distribution, 52nd Street Plant, Phoenix, Arizona, 1990-93, Phases 1 and 2.
MOTOROLA PLATE AND FRAME HEAT EXCHANGER
Mechanical systems design for a plate and frame heat exchanger as part of a hydronic economizer to provide up to 1,000 tons of "free" cooling during the winter months at the Motorola Roosevelt Campus, Scottsdale, Arizona, 1990.
MOTOROLA BUILDING P, SOLVENT EXHAUST AND THERMAL OXIDIZER
Mechanical and electrical systems design (including coordination of Structural Engineering) for the segregation of exhaust for solvent Building P (building area is 225,000 SF), at the McDowell Plant, Phoenix, Arizona, 1990. Exhaust system design to connect to thermal oxidizer system.
MOTOROLA RFO - CLEAN ROOM
Mechanical design services for renovating a 10,000 SF area for Class 100 Clean Rooms, utilizing existing AHUs and modifying the same as required to maintain 70oF + 1oF and 45% RH. In addition, a major design was done for a separate solvent and exhaust system utilizing existing scrubbers for the acid system, 52nd Street Plant, Phoenix, Arizona, 1988-89.
GOULD HAZARDOUS WASTE SUMP AND SLAB
Mechanical systems design for the 160 SF hazardous waste sump and slab, including the addition of a new fume scrubber and relocation of the existing fume scrubber, for Gould Corporation, Chandler, Arizona, 1989.
MOTOROLA BUILDING A, B, D & P SOLVENT EXHAUST
Mechanical and electrical systems design (including coordination of Structural Engineering) for the segregation of exhaust for Solvent Buildings A, B, & D (building area is 450,000 SF) at the McDowell Plant, Phoenix, Arizona, 1989.
UNION CARBIDE SPECIALTY GAS PLANT
Mechanical systems design for the new 30,000 SF Specialty Gas Plant, including a 1,500 SF Class 100 Clean Room and a 4,500 SF Class 10,000 Clean Room, Kingman, Arizona, 1989.
ARIZONA STATE UNIVERSITY HAZARDOUS WASTE FACILITY
Ventilation of hazardous waste facility and waste system, 1,500 SF.
ARIZONA STATE UNIVERSITY - ENGINEERING RESEARCH CENTER*
Provided complete site selection, programming, preliminary design and construction management of a 120,000 SF research facility with class 100 solid state clean room laboratory, $11M.