EDUCATIONAL K-12 EXPERIENCE LIST

AVONDALE ELEMENTARY SCHOOL DISTRICT

Elementary School - HVAC, plumbing, and fire protection systems design for a new 69,000 SF Elementary School in Avondale, Arizona, 1988.


BUCKEYE UNION SCHOOL DISTRICT

Buckeye High School

This project was the largest building replacement project in the State for the Arizona School Facilities Board Deficiency Projects.  Sullivan Designs provided MP&E plans for the new two story high school building which included a central plant mechanical system.  The building design featured a kitchen/cafeteria, auto/metal/wood shops, science and home economics classrooms and separate media center.  Buckeye, Arizona, 2004.

Buckeye School Addition - HVAC and plumbing systems design on new classrooms; remodel of existing building and rerouting site, sewer, water, and gas, Buckeye, Arizona, 1986.


CASA GRANDE ELEMENTARY SCHOOL DISTRICT

Elementary School - HVAC and plumbing systems design for Casa Grande Elementary School (Grades K-6), Casa Grande, Arizona, 1976.


CHANDLER SCHOOL DISTRICT

Chandler #14, #15, & #16 Elementary Schools - Prepared HVAC, plumbing and electrical construction documents and provided construction administration services for three new 65,000 to 66,000 SF elementary schools for the Chandler School District. Chandler, Arizona; $13.8M; 1995-98.

Bogle Middle School - 155,000 SF HVAC, plumbing, fire protection, and electrical systems, 1994-95.

Chandler Elementary School - HVAC, plumbing, fire protection, and electrical systems design for a new 55,000 SF elementary school, 1992.

Salk Elementary School Remodel/Additions - HVAC, plumbing, and electrical engineering services for remodeling the existing Multipurpose Room, Teachers' Lounges, Music Room, Kitchen, and three Classrooms. Also included was the addition of a 660 SF Administrative Office and an Entrance Canopy Addition, Mesa, Arizona, 1992.

Jacobsen Elementary School - HVAC, plumbing, fire protection, and electrical systems design for an 80,000 SF elementary school in the Chandler School District, Chandler, Arizona, 1989.

Chandler High School Kitchen Remodel - HVAC and plumbing systems design for the remodel of a 5,000 SF Kitchen at Chandler High School, Chandler, Arizona, 1987.

Goodman Elementary School - HVAC, plumbing, and fire protection systems design for a new 57,000 SF Elementary School in Chandler, Arizona, 1987.


CHARTER/INDEPENDENT SCHOOLS

The King David School
King David School in Scottsdale, Arizona
This school is part of the Ina Lavine Jewish Community Campus near Scottsdale Road and Sweetwater Avenue in Scottsdale, Arizona.  The project consisted of the mechanical, plumbing, and electrical design of five buildings which included a 2,218 s.f. kindergarten building, a 10,092 s.f. lower grades building, a two-story 14,742 s.f. middle school, a 8,310 s.f. multipurpose building, and a 5,261 s.f. administration building.  The multipurpose building has been designed to serve as a religious sanctuary, a theatrical performance area, a dining room, and as an arena for numerous indoor sporting events.  The master plan for the campus includes a future media center, art classroom building, outdoor amphitheater, and an additional classroom building.  The facility is an independent, co-educational Jewish day school for students enrolled in kindergarten through 8th grade and was opened for the 2004-2005 school year.  The construction cost was $3.7 million.

Horizon Charter School - HVAC, plumbing, fire protection and electrical design of a new 81,000 SF charter school, Phoenix, Arizona, 1998.

Noah Webster - This project is currently under construction in the City of Mesa.


CHINLE UNIFIED SCHOOL DISTRICT

Mesa View Elementary

Mechanical, plumbing, and electrical design for new 82,680 SF elementary school in the Chinle School District.  Project consisted of four buildings including a two-story classroom building, a single-story classroom building, an administration building, and a multipurpose/kitchen building.  The project was part of the Arizona School Facilities Board projects and provide the district with 42 classrooms for grades K-6.  The focal point of the project is the state-of-the-art media center and computer lab with a two-story octagonal cultural hogan classroom.  The multipurpose building incorporates a 2,600 SF commercial kitchen, a 7,600 SF gym/dining area, and an additional 3,800 SF for music and art classrooms.  The mechanical system consisted of split system and packaged rooftop units to provide air conditioning for the entire school and the electrical system included energy efficient occupancy sensors and a building lightning protection system.  Chinle, Arizona, 2004.

Chinle Junior High School Addition

Mechanical, plumbing, and electrical design for a new 21,800 SF classroom wing to existing Junior High School.  The addition added 16 new classrooms, one new computer lab, and student use restrooms.  The mechanical system consisted of evaporative cooling with gas-fired heating.  Chinle, Arizona, 2003.

Chinle High School - Miscellaneous Projects
Mechanical design for reducing sound levels of existing HVAC equipment.  Electrical design for new well pump.

Tsaile Elementary School HVAC Replacement
Mechanical and electrical design to replace existing HVAC units for 48,000 SF of administration, classroom, multipurpose, and corridor area of existing school.  Chinle, Arizona, 2003.

Tsaile Elementary School - New Double Hogan
Mechanical, plumbing, and electrical design for a new cultural double hogan building at existing school campus.  Each hogan room is 700 SF with a connecting hallway and shared restrooms.  The electrical design also included new lighting for the existing parking lot and bus circle.


COTTONWOOD-OAK CREEK SCHOOL DISTRICT

Oak Creek School - HVAC, plumbing and fire protection systems design for 10,800 SF junior high school, Cornville, Arizona, 1986.

Cottonwood Elementary & Cottonwood Junior High School Additions, Phase II -HVAC and plumbing systems design for 24,010 SF new construction and 18,485 SF remodeled area, Cottonwood, Arizona, 1986. 

Cottonwood Elementary Phase I - HVAC, plumbing and fire protection systems design for 69,000 SF elementary school, Cottonwood, Arizona, 1986.


FOUNTAIN HILLS UNIFIED SCHOOL DISTRICT

McDowell Mountain Elementary School - HVAC, plumbing and fire protection systems design for new 65,000 SF elementary school, Fountain Hills, Arizona, 1986.


FREDONIA-MOCCASIN UNIFIED DISTRICT

Fredonia High School/Elementary School - HVAC, plumbing, fire protection, and electrical systems design for the 14,000 SF addition and remodel, including a 5,500 SF Library, Fredonia, Arizona, 1989.


GLENDALE UNION HIGH SCHOOL DISTRICT

Cortez High School - Teacher's Lounge Revisions - HVAC, plumbing and fire protection design revisions for 2,500 SF teachers lounge area at Cortez High School, Phoenix, Arizona, 1986.

Glendale School District Retrofits - Performed site investigation of existing HVAC, plumbing and electrical construction documents and provided construction administration services for eight schools within the Glendale School District. This included demolition of mechanical and electrical equipment, the addition of air conditioning units and water source heat pump units, modifications to the existing electrical systems, field verification of existing mechanical and electrical conditions, and specification. Glendale, Arizona; $6M; 1995.


GLOBE UNIFIED SCHOOL DISTRICT

High Desert Middle School
High Desert Middle School in Globe, Arizona
This project was part of the Arizona School Facilities Board's school replacement program.  The 83,344 s.f. school is made up of three buildings and incorporates an administration area, media center, cafeteria/kitchen, multipurpose room, and a state-of-the-art performance theater.  The school provides 40 classrooms for students in grades 5th through 8th.  On March 27th in 2003 Governor Napolitano was on hand at the groundbreaking ceremonies and the school opened for the 2004-2005 school year.  The construction cost was $7.4 million.


HUMBOLDT UNIFIED SCHOOL DISTRICT

Bradshaw Mountain High School - HVAC, plumbing, fire protection, and electrical systems design for new 156,000 SF school, Prescott Valley, 1995-96.


ISAAC ELEMENTARY DISTRICT

Isaac Primary Campus - HVAC, plumbing, fire protection, and electrical systems design for a new 31,000 SF elementary school, Phoenix, Arizona, 1990.


KINGMAN UNIFIED SCHOOL DISTRICT

Kingman Junior High School Addition - HVAC, plumbing, fire protection, and electrical systems design for the 10,000 SF addition to the Kingman Junior High School, Kingman, Arizona, 1989.

Cerbat Elementary School - HVAC, plumbing, fire protection, and electrical systems design for the 70,000 SF elementary school, Kingman, Arizona, 1989.

Kingman Junior High School/Elementary School Additons & Remodels - HVAC, plumbing, and fire protection systems design for 7,700 SF of new construction and 8,000 SF of remodel in Kingman, Arizona, 1987.


KYRENE SCHOOL DISTRICT

 Kyrene de las Manitas

Prepared mechanical, plumbing and electrical construction documents and provided construction administration services for an 80,000 SF elementary school in the Kyrene School District. Phoenix, Arizona, 1996.

Kyrene Las Lomas Elementary School - Prepared HVAC, plumbing and electrical construction documents and provided construction administration services for an 80,000 SF elementary school in the Kyrene School District. Phoenix, Arizona; $7M; 1996-98.  Subsequently a 65,000 SF Classrooms/Administration/ Food Service new Central Plant, $5.8M, 1997-98.

Alturas Elementary School - 68,000 SF Classrooms Administration, expansion of adjacent Middle School Central Plant to serve the elementary school.

Cerritos Elementary/Altadena Middle School - 150,000 SF Classrooms/Media Center/Gym and
Multi-Purpose, 1994.

Brisas Elementary/Aprende Middle School - 150,000 SF Classrooms/Media Center/Gym and 
Multi-Purpose, 1994.

Esperanza School - 60,000 SF Classrooms, 1993.

Kyrene Mirada School - Media Center, Cafeteria, 1993.

Kyrene Del Pueblo School - 25,000 SF Classroom Building, 1993.

Akimel A'al Middle School

HVAC, plumbing, fire protection, and electrical systems design for a 150,000 SF middle school in the Kyrene School District, Phoenix, Arizona, 1991.

Kyrene Del Norte Elementary School - HVAC and electrical engineering systems design for the 38,000 SF remodel/renovations at Kyrene Del Norte Elementary School, Tempe, Arizona, 1991.

Kyrene Centennial Junior High School - HVAC, plumbing, fire protection, and electrical systems design for a new 101,000 SF school, Phoenix, Arizona, 1989.  Also a HVAC, plumbing, fire protection, and electrical systems design for an addition of 28,000 SF to the school, Phoenix, Arizona, 1994.

Waggoner Junior High School - Complete air conditioning remodel to the 56,000 SF Junior High School, Phoenix, Arizona, 1988.

Kyrene De La Monte Vista Elementary School - HVAC, plumbing, fire protection, and electrical systems design for a new 50,000 SF elementary school, Phoenix, Arizona, 1988.

Waggoner Elementary Additions & Alterations - HVAC and plumbing systems design for a 5,600 SF Administrative Building addition and Teacher's Lounge remodel in Phoenix, Arizona, 1987.

Waggoner Elementary/Kyrene Junior High School Renovations - HVAC and plumbing systems design for 10,000 SF renovation to Waggoner Elementary/Kyrene Junior High School in Phoenix, Arizona, 1987.

Kyrene Colina & Sureno Relocatables - HVAC and plumbing systems design for two 15,000 SF relocatable buildings, Phoenix, Arizona, 1987.

Kyrene De Los Lagos Elementary School - HVAC, plumbing, and fire protection systems design for a new 50,000 SF elementary school, Phoenix, Arizona, 1987.

Kyrene Del Sureno Elementary School - HVAC, plumbing, and fire protection systems design for a new 50,000 SF elementary school, Phoenix, Arizona, 1987.

Kyrene De La Mariposa Elementary School - HVAC, plumbing, and fire protection systems design for a new 50,000 SF elementary school, Phoenix, Arizona, 1987.

Waggoner Elementary School - HVAC, plumbing, and fire protection systems design for 11,300 SF Library and Multipurpose Building, Tempe, Arizona, 1986.


LITCHFIELD SCHOOL DISTRICT

Litchfield Verrado

The Litchfield Elementary School District has constructed a new middle school of 98,985 SF to serve the new planned community of Verrado.  Verrado is referenced as "Home Town, Arizona" and this modern educational facility expresses that very idea.  Sullivan Designs Inc. prepared the HVAC, plumbing, and electrical engineering documents as well as construction administration services.  Verrado, Arizona 2004.

Litchfield Dreaming Summit
 
Litchfield Dreaming Summit Elementary School is an 86,363 SF prototypical educational facility in the Dreaming Summit neighborhood of Litchfield Park.  The campus consists of six pods of 5 classrooms each that surround a spacious open courtyard.  At each end of the courtyard are the support facilities that include a 6,600 SF media center to the south and a 29,700 SF building to the north that houses the multipurpose area, kitchen/dining areas, administration, and specialty classrooms.  The school is situated on 17.64 acres that include lighted parking lots with 176 parking spaces, two lighted basketball courts, a baseball field, and a soccer field.  A seventh pod of 5 classrooms was added to the site just after completion of the main building which opened in the fall of 2004.  The HVAC system designed by Sullivan Designs, Inc. consisted primarily of packaged rooftop units and the electrical system consisted of a 2,000 amp (277/480Volt) distribution network with a 20kW natural gas generator for emergency power.  13335 West Missouri Avenue, Litchfield Park, Arizona,  2004.

Wigwam Creek Middle School

Corte Sierra Elementary School

Rancho Santa Fe Elementary School

HVAC, plumbing, fire protection, and electrical design for a new 88,037 SF elementary school in the Litchfield School District, Avondale, Arizona, completed 2001.  Total project cost $6.5 Million.  Click on the picture for further details.

Palm Valley Elementary - HVAC, plumbing, fire protection, and electrical design for a new 68,000 SF elementary school in the Litchfield School District, Litchfield Park, Arizona, 1998.

Western Sky Middle School - HVAC, plumbing, fire protection, and electrical design for a 14,000 SF classroom addition in the Litchfield School District, Goodyear, Arizona, 1998.


MADISON SCHOOL DISTRICT

Madison I Additions & Alterations - HVAC and plumbing systems design for the remodel of a 72,000 SF school, Phoenix, Arizona, 1988, $2.5M.

Rose Lane Additions & Alterations - HVAC and plumbing systems design for the total remodel and replacement of a 65,000 SF school, Phoenix, Arizona, 1988, $3M.


MESA PUBLIC SCHOOLS

Longfellow Elementary School Remodel - HVAC, plumbing, fire protection, and electrical systems design for the 35,000 SF remodel to Longfellow Elementary School, Mesa, Arizona, 1991.


PAGE UNIFIED SCHOOL DISTRICT

Page Elementary School - HVAC, plumbing and fire protection systems design for new 75,000 SF elementary school, Page, Arizona, 1986.


PENDERGAST SCHOOL DISTRICT

PENDERGAST SUPPORT SERVICES BUILDING
This project is currently under construction.

Sun Ridge Elementary (Pendergast School #11) - 

Sun Ridge Elementary is a 74,000 SF prototypical campus consisting of four separate buildings.  Three of the buildings are approximately 14,000 SF classroom buildings with supporting restrooms and utility rooms.  The fourth building is 32,000 SF and houses the state of the art media center, full serving kitchen and cafeteria with stage, administration area, and specialty classrooms such as art and computer labs.  Sullivan Designs provided the mechanical, plumbing, and electrical design for this project located in the city of Glendale.  The mechanical system was designed around package rooftop units with outside air economizers sized from one to ten tons.  The design also included a make-up air system for the kitchen's type 1 grease hood.  The plumbing design featured electronic sensors for wash fountains and flush valves.  Electrically, a 277/480V distribution system was designed for a new 2,000 amp service.  Street/parking lot lighting and engineered fire alarm drawings were also submitted as part of the construction permit set.  The school was opened for the fall 2004 session for 500 students in grades kindergarten through eighth grade.  For school website, click here.  Glendale, Arizona. 

Westwind Primary

Rio Vista Elementary School (Pendergast School #10)

Prototypical school located at 103rd Avenue and Encanto in Avondale, Arizona.  For school website, click here.  Avondale, Arizona.

Sonoran Sky Elementary School (Pendergast School #9)
Prototypical school located at 85th Avenue and Missouri in Glendale, Arizona.  For school website, click here.  Glendale Arizona.

Pendergast Elementary, Villa De Paz, and Westwind
Arizona School Facilities Board deficiency projects for the upgrade of mechanical systems, lighting systems, and fire alarm systems at multiple campuses.  Project completed in 2002.

Pendergast Maintenance Facility

New maintenance facility for the Pendergast School District.  

Copperking Elementary - HVAC, plumbing, fire protection and electrical design for a new 70,000 SF elementary school in the Pendergast School District, Glendale, Arizona, 1998-99.

Pendergast School #6 - New Classroom, Administration Building, 25,000 SF, 1993.

Garden Lakes Elementary School Phase 3A - HVAC, plumbing, fire protection for a new 6,000 SF Classroom Building, Phoenix, Arizona, 1992.

Villa De Paz IV - HVAC and plumbing systems design for new 12,700 SF Café/Aud/Music Building and 7,500 SF Industrial Arts/Home Ec Classrooms, Phoenix, Arizona, 1987.

Villa De Paz III - HVAC and plumbing systems design for remodel of 10,200 SF school, Phoenix, Arizona, 1986.

Pendergast School - HVAC and plumbing systems design for 19,000 SF school, Phoenix, Arizona, 1986.

Villa De Paz Elementary School Addition - HVAC and plumbing systems design for 19,000 SF elementary school addition, Phoenix, Arizona, 1986.


PEORIA SCHOOL DISTRICT

Peoria High School Engineering & Bio-tech. Facility - HVAC, plumbing, fire protection and electrical design for a new 31,000 SF industrial arts, drafting, bio-tech & agriculture and auto shop facility in the Peoria School District, Peoria, Arizona, 1999.

HVAC, plumbing, fire protection, and electrical engineering services on the Peoria Elementary Schools HVAC retrofit and Technology Classroom Remodel, Peoria, Arizona, 1992.

HVAC, plumbing, fire protection, and electrical systems design for eight schools within the Peoria School District. This included demolition of mechanical and electrical equipment, the addition of air conditioning units and split system heat pump units, modifications to the existing electrical systems, field verification of existing mechanical and electrical conditions, and specification of natural gas piping systems, Peoria, Arizona, 1990.


PHOENIX UNION HIGH SCHOOL DISTRICT

Central High School - HVAC, plumbing, fire protection, and electrical systems design for a new 100,000 SF school with a 2,800 SF Community-based Handicapped Training Center, Phoenix, Arizona, 1989.

South Mountain High School Auditorium - HVAC, plumbing and fire protection systems design and remodel for 30,000 SF auditorium, Phoenix, Arizona, 1986.


PRESCOTT HIGH SCHOOL FINE ARTS FACILITY
HVAC, plumbing, fire protection, and electrical systems design for the remodel of a 30,000 SF school, Prescott, Arizona, 1989.

PRESCOTT JUNIOR HIGH SCHOOL/DEXTER ELEMENTARY SCHOOL
HVAC, plumbing, fire protection, and electrical systems design for modernization of the 100,000 SF old Prescott Junior High School/Dexter Elementary School, Prescott, Arizona, 1989.


SANTA CRUZ UNIFIED SCHOOL DISTRICT

Santa Cruz Valley Union High School - HVAC, plumbing, fire protection and electrical design for 33,000 SF of additions and alterations, existing campus central plant was renovated for installation of a new 250 ton chiller, heat exchanger and boilers.

San Cayetano Elementary School, Calabasas Middle School and Rio Rico High School - Prepared HVAC, plumbing, fire protection, and electrical construction documents and provided construction administration services for a new 140,000 SF school with a community-based handicapped training center. Santa Cruz, Arizona; $12M; 1993-94.  Click here for additional information.


SCOTTSDALE UNIFIED SCHOOL DISTRICT

Coronado High School - HVAC and plumbing systems design for the 20,000 SF Classroom and 25,000 SF Media/Gymnasium for Coronado High School, Scottsdale, Arizona, 1988.

Supai Middle School - HVAC, plumbing, and fire protection systems design for 27,750 SF of new construction and 4,936 SF remodel, Phoenix, Arizona, 1987.

Renovations at Tonolea, Hohokam, Ingleside Middle, Pima, and Yavapai Elementary Schools - HVAC and plumbing systems design for various school renovations, Scottsdale, Arizona, 1987.

Ingleside School - HVAC, plumbing, and fire protection systems design for 26,900 SF of new construction and 7,950 SF remodel, Phoenix, Arizona, 1987.

Supai and Ingleside Middle Schools - Remodel of HVAC and plumbing systems design, total 8,000 SF, Scottsdale, Arizona, 1986.


SEDONA-OAK CREEK UNIFIED SCHOOL DISTRICT

West Sedona School - HVAC, plumbing and fire protection systems design for 36,000 SF school, Sedona, Arizona, 1986.


TEMPE UNION SCHOOL DISTRICT 

Marcos De Niza - Renovation/replacement of domestic cold water and hot water system, 1997-98, $300K. 

Marcos De Niza - Replacement and upgrade of central plant equipment, two (2) new 325 ton chillers, piping, controls, etc., 1995-96.

McClintock High School - Air conditioning upgrade, Phase I in 1993, Phase II in 1995-97, $742K.

Mountain Pointe High School - replace three 300 ton chillers, 1997, $506K.

Tempe High School - air conditioning upgrade, 1995-97, $450K.


WASHINGTON ELEMENTARY SCHOOL DISTRICT

Washington Elementary School Upgrades - New air conditioning system, electrical system, lighting & power, and upgrade plumbing system in existing classrooms, new classroom addition and cafeteria upgrades for 7 schools in the Washington School District. Last seven (7) schools were Lakeview, Acacia, Miller, Roadrunner, Sunnyslope, Mt. View, Royal Palm. Twenty-five (25) more will be done in the next two (2) years. Each is 30,000 SF to 45,000 SF, 1993-95.

HVAC and plumbing systems design for Washington School District, Phoenix, Arizona, 1975.


YUMA ELEMENTARY SCHOOL DISTRICT

O.C. Johnson School Classroom Additions - HVAC, plumbing, and electrical engineering services for two new 3,000 SF Classroom Buildings (6,000 SF total) at O.C. Johnson School, Yuma, Arizona, 1992.

Otondo Elementary School - HVAC, plumbing, and fire protection systems design for a new 90,000 SF elementary school, Yuma, Arizona, 1990.


CASA GRANDE ELEMENTARY SCHOOL DISTRICT

Elementary School - HVAC and plumbing systems design for Casa Grande Elementary School (Grades K-6), Casa Grande, Arizona, 1976.